TELUS NETWORKS LLP. has attained significant expertise in Base Transreceiver System (BTS) -Installation & Commissioning Service.
BTS Installation (includes the following activities):
INDOOR WORK
- BTS Installation As Per Layout Plan
- Battery Bank Installation, Interconnection & Cabling Of BTS
- Rectifier Rack/ SMPS Installation
- PCM Routing And Kroning, Alarm Cable Routine
- ECB, IGB, EMP Installation & Earthing
- FEP Cutting, Finishing, Sealing, Jumper Routine, Connectorisation And Termination
- Indoor Cable Tray Installation
- Labelling Of All The Cables And Jumpers As Per Customer Standard
- All Work Is To Be Carried Out As Per Layout
OUTDOOR WORK
- BTS Installation As Per Layout Plan
- Battery Bank Installation, Interconnection & Cabling Of BTS
- Rectifier Rack/ SMPS Installation
- PCM Routing And Kroning, Alarm Cable Routine
- ECB, IGB, EMP Installation & Earthing
- FEP Cutting, Finishing, Sealing, Jumper Routine, Connectorisation And Termination
- Indoor Cable Tray Installation
- Labelling Of All The Cables And Jumpers As Per Customer Standard
- All Work Is To Be Carried Out As Per Layout
MICROWAVE LINK
The following activities is carried out for one Hop ie. at two different sites to make one link
- Microwave Rack Installation
- Mini Link Installation & Commissioning Of FIU/RRI/EITI
- Antenna Installation & IF Cable Routine
- DC Connection To Mini Link Through DCDB / MCB
- Earthing Of Rack, IF As Per Site Engineer Instruction
- Alignment Of Microwave To Achieve Required Level
BTS COMMISSIONING AND INTEGRATION SERVICES
TELUS NETWORKS LLP has attained significant expertise in BTS commissioning. The work involves following activities:
- Test & Installation Of Antenna Systems
- Installation, Hop Alignment & Commissioning
- Test Of Microwave Antenna Systems
- Test & Commissioning Of T1/E1
- Test & Commissioning Of BTS/RBS
- Integration Of BTS/RBS With BSC
- Site Acceptance & On-Air Call Testing
- Preparing the BT 3002 cable from BTS to DDF block with T 43 sockets at BTS end and T 43 Plug at DDF end
- Preparing the BT 3002 cable from DDF to M/W equipment with T 43 Plug at DDF end and BNC Male Connector at M/W equipment at end
- Pix Alarm wiring to be done with termination of alarm points on the krone DDF
- Termination & Testing of all external alarms on the Krone DDF
- NMS Cable termination as per requirement
- VSWR test of antennas using site master test equipment
- Frequency calibrations through freq counter equipment
- Cross connection through Far end at bypassing
- Power Calibration & Power measurement through Digital Power Meter
- Call & Sector swapping testing using Net Monitor Software by cell phone
- BTS & M/W inventory list with product serial numbers
- Final Site Layout drawing & plan
- Site inventory list with all equipment serial numbers