The following activities are carried out for one Hop ie. at two different sites to make one link
- Microwave Rack Installation
- Mini Link Installation & Commissioning Of FIU/RRI/EITI
- Antenna Installation & IF Cable Routine
- DC Connection To Mini Link Through DCDB / MCB
- Earthing Of Rack, IF As Per Site Engineer Instruction
- Alignment Of Microwave To Achieve Required Level